SYSTEM DEVELOPMENT CORP., "System design specifications for LUCID phase I," Tech. Memo No. TM-1749/0O0/O0, Santa Monica, Calif., Jan. 1964.

(1964)
  • (1964) "GENDARME data processing facilities," Tech. Memo No. TM-1749/ 201/00. (Vol 2 of report)
  • (1964) "Lucid program design: the grammar of OPAQUE," Tech. Memo No. TM-1749/301/O0 (Vol 3 of report)
  • Lucid control system design (Vol 1 of report) < (1964) Lucid control system design (Vol 1 of report)
    Part 1. The Master Tape, Tech Memo No. TM-1749/101/00.
    Part 2. Parameter Load, Tech Memo No. TM-1749/102/00.
    Part 3. Operational Control, Tech Memo No. TM-1749/103/00.
    Part 4. Test Set-Up, Tech Memo No. TM-1749/104/00.